From the NRC:
On December 31, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an integrated inspection at your Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The enclosed integrated inspection report documents the inspection results, which were discussed on January 15, 2010, with Mr. William Maguire and other members of your staff.
No comments:
Post a Comment