Thursday, August 28, 2014

Peach Bottom: Loss of Safety Function

 
 
That the loss of the ultimate hear sink (LOUHS) could simultaneously effect two units is a major concern.
 
Power ReactorEvent Number: 50395
Facility: PEACH BOTTOM
Region: 1 State: PA
Unit: [2] [3] [ ]
RX Type: [2] GE-4,[3] GE-4
NRC Notified By: PAUL BOKUS
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 08/23/2014
Notification Time: 20:19 [ET]
Event Date: 08/23/2014
Event Time: 13:00 [EDT]
Last Update Date: 08/23/2014
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(A) - POT UNABLE TO SAFE SD
50.72(b)(3)(v)(B) - POT RHR INOP
 
UnitSCRAM CodeRX CRITInitial PWRInitial RX ModeCurrent PWRCurrent RX Mode
2NY100Power Operation100Power Operation
3NY100Power Operation100Power Operation

Event Text
LOSS OF SAFETY FUNCTION

"At 13:00 [EDT] on Saturday, August 23, 2014, both trains of the Peach Bottom Atomic Power Station (PBAPS) Emergency Service Water (ESW) System were declared inoperable on Unit 2 and Unit 3, due to a pin-hole, through wall piping leak. In accordance with 10CFR 50.72(b)(3)(v), this event is being reported as an event or condition that could have prevented the fulfillment of the safety function of systems that are needed to shut down the reactor and maintain it in a safe shutdown condition, remove residual heat and mitigate the consequences of an accident.

"At 19:22 [EDT], the station received verbal approval of a Notice of Enforcement Discretion (NOED) request. Simultaneously, the station is preparing an evaluation to support an emergent-relief request. 