On December 31, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an integrated inspection at your Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The enclosed integrated inspection report documents the inspection results, which were discussed on January 15, 2010, with Mr. William Maguire and other members of your staff.Download PDF
Tuesday, February 16, 2010
Peach Bottom: NRC integrated inspection report 05000277/2009005 and 05000278/2009005
From the NRC:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment