On Septermber 30, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. Th enclosed integrated inspection report documents the inspection results, which were discussed on October 30, 2009, with Mr. William Maguire and other members of your staff.Read more (PDF)
Wednesday, November 18, 2009
Peach Bottom Atomic Power Station: NRC Integrated Inspection Report 05000277/2009004 and 05000278/2009004
Letter from the NRC to Exelon:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment