Tuesday, February 24, 2015

Susquehanna Steam Electric Station, Units 1 and 2 - Withdrawl of an Amendment Request (TAC NOS. ME9609 and ME9610)

Susquehanna Steam Electric Station, Units 1 and 2 - Withdrawl of an Amendment Request (TAC NOS. ME9609 and ME9610)

Download ML15027A605

Susquehanna Steam Electronic Station, Units 1 and 2 - Supplemental Information Needed for Acceptance of Requested Licensing Action RE: Changes to the Cyber Security Plan Implementation Schedule (TAC NO. MF5358 and MF5359)

Susquehanna Steam Electronic Station, Units 1 and 2 - Supplemental Information Needed for Acceptance of Requested Licensing Action RE: Changes to the Cyber Security Plan Implementation Schedule (TAC NO. MF5358 and MF5359)

Download ML15020A739

Three Mile Island Station, Unit 1 - NRC Integrated Inspection Report 05000289/2014005

Three Mile Island Station, Unit 1 - NRC Integrated Inspection Report 05000289/2014005

Download ML15034A236

Susquehanna Steam Electric Station, Units 1 and 2 - Reassignment of U.S. Nuclear Regulatory Commission Branch Chief

Susquehanna Steam Electric Station, Units 1 and 2 - Reassignment of U.S. Nuclear Regulatory Commission Branch Chief

Download ML15027A614

CLINTON POWER STATION, UNIT NO. 1; DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3; LASALLE COUNTY STATION, UNITS 1 AND 2; LIMERICK GENERATING STATION, UNITS 1 AND 2; OYSTER CREEK NUCLEAR GENERATING STATION; PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3; AND QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS REGARDING ADOPTION OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER, TSTF-535, "REVISE SHUTDOWN MARGIN DEFINITION TO ADDRESS ADVANCED FUEL DESIGNS" {TAC NOS. MF2533, MF2534, MF2535, MF2536, MF2537, MF2538, MF2539, MF2540, MF2541, MF2542, MF2543, AND MF2544)

CLINTON POWER STATION, UNIT NO. 1; DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3; LASALLE COUNTY STATION, UNITS 1 AND 2; LIMERICK GENERATING STATION, UNITS 1 AND 2; OYSTER CREEK NUCLEAR GENERATING STATION; PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3; AND QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS REGARDING ADOPTION OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER, TSTF-535, "REVISE SHUTDOWN MARGIN DEFINITION TO ADDRESS ADVANCED FUEL DESIGNS" {TAC NOS. MF2533, MF2534, MF2535, MF2536, MF2537, MF2538, MF2539, MF2540, MF2541, MF2542, MF2543, AND MF2544)

Download ML14295A300

Thursday, February 5, 2015

Reassignment of U.S. Nuclear Regulatory Commission Branch Chief For Three Mile Island Nuclear Station, Unit 1, Peach Bottom Atomic Power Station, Units 2 and 3, Oyster Creek Nuclear Generating Station, and Limerick Generating Station, Units 2 and 3

Reassignment of U.S. Nuclear Regulatory Commission Branch Chief For Three Mile Island Nuclear Station, Unit 1, Peach Bottom Atomic Power Station, Units 2 and 3, Oyster Creek Nuclear Generating Station, and Limerick Generating Station, Units 2 and 3

Download ML15027A613

Backgrounder on Pilgrim's Recent Problems

Ironically, the NRC announced on Groundhog Day that it was dispatching a special inspection team to Pilgrim to investigate the reasons for the initial loss of the offsite power lines and ensuing problems the operators encountered, including the failure of the HPCI system, the inability to open one safety relief valve from the control room, and the failure of the standby diesel powered compressor to start. Like Bill Murray’s character in the feature film Groundhog Day, Pilgrim seems to be reliving certain things over and over. And over. And over.

Download PDF