Licensees: Energy Harbor Nuclear Corporation
Exelon Generation Company, LLC
Susquehanna Nuclear, LLC
Facilities: Beaver Valley Power Station (Beaver Valley), Units 1 and 2
Calvert Cliffs Nuclear Power Plant (Calvert Cliffs), Units 1 and 2
Limerick Nuclear Generating Station (Limerick), Units 1 and 2
Peach Bottom Atomic Power Station (Peach Bottom), Units 2 and 3
Susquehanna Steam Electric Station (Susquehanna), Units 1 and 2
Date/ Time: Thursday, June 18, 2020
5:30 p.m.
Location: Webinar (advance registration required)
Purpose: The NRC staff will host a webinar to present the NRC’s assessment of
safety performance at Beaver Valley, Calvert Cliffs, Limerick, Peach
Bottom, and Susquehanna for 2019, as described in the 2019 annual
assessment letters. Following the presentation, the NRC will respond to
questions specific to the safety performance of the stations and the
NRC’s role in ensuring safe plant operations.
Action Matrix by Column
Licensee Response
(Baseline Inspection) |
Regulatory
Response (Response at Regional Level) |
Degraded Performance
(Response at Regional Level) |
Multiple/Repetitive Degraded Cornerstone Column
(Response at Agency Level) |
Unacceptable Performance
(Response at Agency Level) |
Arkansas Nuclear 1 | Browns Ferry 1 | |||
Arkansas Nuclear 2 | Browns Ferry 2 | |||
Beaver Valley 1 | Browns Ferry 3 | |||
Beaver Valley 2 | Vogtle 1 | |||
Braidwood 1 | Vogtle 2 | |||
Braidwood 2 | ||||
Brunswick 1 | ||||
Brunswick 2 | ||||
Byron 1 | ||||
Byron 2 | ||||
Callaway | ||||
Calvert Cliffs 1 | ||||
Calvert Cliffs 2 | ||||
Catawba 1 | ||||
Catawba 2 | ||||
Clinton |