Susquehanna Steam Electric Station, Units 1 and 2 - Security Baseline Inspection Report 05000387/2022403 and 05000388/2022403
Tuesday, November 29, 2022
Epstein Petition for Leave to Intervene & Hearing Request at the NRC; Re: Susquehanna Nuclear, LLC. Bankruptcy of Talen Energy Corporation, (Final copy, 11/28/22)
Epstein Petition for Leave to Intervene & Hearing Request at the NRC; Re: Susquehanna Nuclear, LLC. Bankruptcy of Talen Energy Corporation, (Final copy, 11/28/22)
Peach Bottom Atomic Power Station, Unit 2 - Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000277/2022090
November 30, 2022 Peach Bottom Atomic Power Station, Unit 2 - Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000277/2022090
Epstein Petition for Leave to Intervene and Hearing Request at the NRC; Re: Susquehanna Nuclear, LLC. Bankruptcy of Talen Energy Corporation, (11/28/22)
Saturday, November 19, 2022
DOE rejects Palisades application for funds to restart
- By JULIANA KNOT HP Staff Writer
- Nov 18, 2022
Susquehanna Steam Electric Station, Units 1 and 2 - Request for Withholding Information from Public Disclosure (EPID L-2022-LLM-0003)
Subject: Susquehanna Steam Electric Station, Units 1 and 2 - Request for Withholding Information from Public Disclosure (EPID L-2022-LLM-0003)
Susquehanna Steam Electric Station, Units 1 and 2 - Request for Withholding Information from Public Disclosure (EPID L-2019-PMP-0064)
Subject: Susquehanna Steam Electric Station, Units 1 and 2 - Request for Withholding Information from Public Disclosure (EPID L-2019-PMP-0064)
Friday, November 11, 2022
"Nuclear regulators probe two recent incidents at Peach Bottom plant", (November 10, 2022)
"Nuclear regulators probe two recent incidents at Peach Bottom plant”
Susquehanna Steam Electric Station, Units 1 and 2 - Cyber Security Inspection Report 05000387/2022404 and 05000388/2022404 (Cover Letter Only)
Susquehanna Steam Electric Station, Units 1 and 2 - Cyber Security Inspection Report 05000387/2022404 and 05000388/2022404 (Cover Letter Only)
Thursday, November 10, 2022
Susquehanna Steam Electric Station, Units 1 and 2 - Integrated Inspection Report 05000387/2022003 and 05000388/2022003
Susquehanna Steam Electric Station, Units 1 and 2 - Integrated Inspection Report 05000387/2022003 and 05000388/2022003
ADAMS Accession No. ML22312A357SUS2022-003 IR FINAL.pdf
Susquehanna Steam Electric Station, Units 1 and 2 - Issuance of Amendment Nos. 283 and 266 Re: Change to Reactor Steam Dome Pressure--Low Instrument Function Allowable Value in Technical Specifications (EPID L-2021-LLA-0184)
Subject: Susquehanna Steam Electric Station, Units 1 and 2 - Issuance of Amendment Nos. 283 and 266 Re: Change to Reactor Steam Dome Pressure--Low Instrument Function Allowable Value in Technical Specifications (EPID L-2021-LLA-0184)
Friday, November 4, 2022
Confusing Report Card: Peach Bottom Issued White Finding and Apparent Violation by the NRC
The Color Coded Grading System for Nuclear Plants: "Decoding the Nuclear Crayon"
associated with the violation -- the more steps taken towards
core damage, the fewer steps remaining to complete that journey
the worser the crayon color -- Green to White to Yellow
to Red.
The NRC picked Green for the High Pressure Service Water pump
discharge check valve problem.
power supply glitch that triggered an automatic scram and containment
isolation.
the RPS violation. If anything, the crayon selections should
be reversed.
pressure vessel, is anything but Green if no concurrent failures are
assumed.
not when done properly.PRA looks at the likelihood of success when a safety
component is needed. By assuming zero concurrent failures, NRC
didn't PRA they prayed for good luck.
With the HPSW check valve stuck open, the flow in the running pump dropped
to nearly have the needed flow (5,000 gpm to 3,300 gpm). Which means the
cooling flow provided to emergency systems was nearly halved.
assumed that concurrent failures could be present and lead to core damage.
if you don't know when.
a Green from the preliminary White.
Susquehanna Steam Electric Station, Units 1 and 2 - Federal Emergency Management Agency Level 1 Finding from 2022 Evaluated Emergency Preparedness Exercise
SUBJECT: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 – FEDERAL EMERGENCY MANAGEMENT AGENCY LEVEL 1 FINDING FROM 2022 EVALUATED EMERGENCY PREPAREDNESS EXERCISE
FEMA notification letter to Susquehanna.pdfNRC Publishes Annual Report to Congress on Nuclear Security Inspections
Nuclear Regulatory Commission - News Release
No: 22-045 November 3, 2022
CONTACT: David McIntyre, 301-415-8200
Tuesday, November 1, 2022
NRC Announces Headquarters and Regional Leadership Appointments
Nuclear Regulatory Commission - News Release
No: 22-044 October 31, 2022
CONTACT: Office of Public Affairs, 301-415-8200