Thursday, May 26, 2016

Peach Bottom Letter 2016-403

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 and 3 - SECURITY INSPECTION REPORT 05000277/2016403 AND 05000278/2016403, AND EXERCISE OF ENFORCEMENT DISCRETION

Download PDF

Sirens Sound At Beaver Valley


Power ReactorEvent Number: 51948
Facility: BEAVER VALLEY
Region: 1 State: PA
Unit: [1] [2] [ ]
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: MIKE ADAMS
HQ OPS Officer: STEVEN VITTO
Notification Date: 05/20/2016
Notification Time: 18:40 [ET]
Event Date: 05/20/2016
Event Time: 15:31 [EDT]
Last Update Date: 05/20/2016
Emergency Class: NON EMERGENCY
10 CFR Section: 
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization): 
ANNE DeFRANCISCO (R1DO)
UnitSCRAM CodeRX CRITInitial PWRInitial RX ModeCurrent PWRCurrent RX Mode
1NY100Power Operation100Power Operation
2NY100Power Operation100Power Operatio
Event Text
OFFSITE NOTIFICATION DUE TO INADVERTENT SOUNDING OF THE EMERGENCY NOTIFICATION SIRENS 

"At approximately 1531 [EDT] hours, a tornado signal was inadvertently activated from Hancock County, West Virginia which sounded 118 out of 120 Emergency sirens. The remaining 2 sirens do not receive a tornado signal. The sirens alarmed for approximately 3 minutes. A silent test was subsequently performed for all 120 sirens and validated the emergency siren system remains functional. 

"In accordance with 10 CFR 50.72(b)(2)(xi), News Release or Notification of Other Government Agency, a 4 hour notification is required. 

"The [NRC] Senior Resident Inspector has been notified. No press releases are planned." 

The licensee notified state and local agencies.

Tuesday, May 24, 2016

NRC to Hold Meeting with Exelon on May 26 in Stafford Township, N.J., Regarding Performance of Oyster Creek Nuclear Power Plant

No. I-16-016
May 20, 2016
Contact:
Diane Screnci, 610-337-5330
Neil Sheehan, 610-337-5331

NRC to Hold Meeting with Exelon on May 26 in Stafford Township, N.J., Regarding Performance of Oyster Creek Nuclear Power Plant

The Nuclear Regulatory Commission will share information on its annual assessment of safety performance at the Oyster Creek nuclear power plant during a public meeting on Thursday, May 26, in the Manahawkin section of Stafford Township, N.J.

The meeting is scheduled to begin at 6 p.m. at the Holiday Inn Manahawkin, at 151 Route 72 West, in Stafford. During the session, NRC staff will answer questions on the plant’s performance and the agency’s oversight activities at the Lacey Township, N.J., plant, which is owned and operated by Exelon.

Download PDF

PA DEP News Release : Wolf Administration Investing $25.1 Million in Projects to Protect and Improve Pennsylvania Water Resources

COMMONWEALTH OF PENNSYLVANIA
Dept. of Environmental Protection
Commonwealth News Bureau
Room 308, Main Capitol Building
Harrisburg PA., 17120

FOR IMMEDIATE RELEASE
05/18/2016

CONTACT:
Neil Shader
717-787-1323
Jeff Sheridan
717-783-1116

Wolf Administration Investing $25.1 Million in Projects to Protect and Improve Pennsylvania Water Resources

Pennsylvania Governor Tom Wolf announced today the selection of 114 projects to receive $25,143,294 in funding from Department of Environmental Protection (DEP), for the protection of Pennsylvania’s water resources. The selected projects enhance watersheds, mitigate acid mine drainage, and support water pollution cleanup programs.

“The Growing Greener program, and this year’s funding, is an investment in our future and proof that when state government works collaboratively, we achieve long-lasting results,” said Governor Wolf.

“The Environmental Stewardship Fund has helped spark innovation and coordinate partnerships to tackle some of the most challenging environmental issues in our state.”

Read Article

Monday, May 23, 2016

Our colleague and friend, Michael Mariotte - Dec. 9, 1952 – May 16, 2016


           Apologies for multiple posts—You were on Michael’s Nov 2014 LIFETIME ACHEIVEMENT AWARDS LIST
 
https://scontent-lga3-1.xx.fbcdn.net/v/t1.0-9/13239281_10207612748669020_8003394989452346657_n.jpg?oh=6f7b3d2d79a08d2a46f52d7f668809cc&oe=57DE23F7(Source: Nuclear Information and Resource Service) https://scontent-lga3-1.xx.fbcdn.net/v/t1.0-9/10676173_10152747423230479_5731550868242131784_n.jpg?oh=f6067dcc083fc31aecb53ef6b965a8ef&oe=57DF7A37cid:image001.jpg@01D1B05C.BEBD4590Image result for michael mariotte at nirs photo
Dear Friends of NIRS,
We have very sad news to share. Our colleague and friend, and longtime leader, Michael Mariotte died yesterday. As you all know, he has waged a brave struggle against pancreatic cancer for three years, but we understand that this could still come as a surprise. It has hit us all very hard. Michael's condition worsened very quickly over the last couple of weeks, and even more so in recent days. He was so committed to our work, that he continued right up until the last week or so, giving many the impression that he was going strong.
Though the last few months were very difficult for him, he died peacefully at home and his family was with him. He is survived by his wife Tanya, their young daughters Zoryana and Kateryna, his friend and ex-wife Lynn, and their children Nicole and Richard, as well as his sister Julie, brother Jeff, and sister-in-law Marsheila.
Michael did not want to have a funeral - it was not his way. Rather, he has asked friends to gather and do something fun in his memory. That was his way, to honor life by living and enjoying it to the fullest.
And, of course, by fighting for it. Most of us know him originally and primarily as both parts colleague and comrade, in our work to protect life and to make the world a safer, better, and more just place in which to live.
PLEASE JOIN Michael’s family, music and work colleagues, friends, neighbors and all to hug, cry, and share memories at the
Hyattsville BUSBOYS and POETS, 5331 Baltimore Avenue, Hyattsville, MD 20781
Gathering Thursday MAY 19th from 4:00 -8:00 PM
with the Program beginning at ~ 5:30.
We are also planning to have an event in a month or so, to give the wider NIRS community an opportunity to come together and celebrate Michael and his work, and to chart our path forward. We have a lot of work to do, and Michael would not have wanted us to skip a beat. One of the last things we spoke about on Friday was the latest reactor closure announced last week -- Fort Calhoun, in Nebraska. He knew the struggle had to go on without him, and was glad to know one more reactor is shutting down.
If you would like to send a message of support to his family, we encourage you to do so. Michael's family has a lot to deal with in the wake of their loss, so NIRS has offered to collect and pass on messages from the activist community. We will be collecting posts from Facebook, which is already filling up with wonderful messages. You can also send an email to us at nirs@nirs.org, or a card or letter to NIRS's office: 6930 Carroll Ave., Suite 340, Takoma Park, MD 20912.
We will be posting a public statement shortly, and notifying the broader community of NIRS supporters and activists. Please feel free to let people in your networks know.
We know this is difficult news. So many of you were much more than colleagues. If you have any questions, don't hesitate to contact us.
With deep regret, warmest regards, and lots of spunk,

Tim Judson, Executive Director
on behalf of NIRS Staff and Board of Directors

Diane D'Arrigo, Radioactive Waste Project Director
Denise Jakobsberg, Administrative Coordinator
Mary Olson, Southeast Director

Chris Williams, Board Chair
Timothea Howard, Treasurer
Susan Alzner                                                                                                                          
Louis Clark
Peer de Rijk, WISE-International
Bob Eye
Allison Fisher
Daphne Wysham
Elizabeth May, ex officio
Vladimir Sliviak, ex officio

NRC to Hold Open House on May 23 in Limerick, Pa., to Discuss 2015 Performance of Limerick Nuclear Power Plant

Nuclear Regulatory Commission - Press Release

No. I-16-015 May 16, 2016
Contact: Diane Screnci, 610-337-5330 Neil Sheehan, 610-337-5331

NRC to Hold Open House on May 23 in Limerick, Pa., to Discuss 2015 Performance of Limerick Nuclear Power Plant

The Nuclear Regulatory Commission will conduct an open house on Monday, May 23, in Limerick, Pa., to discuss the agency’s annual review of safety performance at the Limerick nuclear power plant.

NRC staff will be at the Limerick Township Municipal Building, at 646 W. Ridge Pike, from 5 - 6:30 p.m. to discuss the plant’s performance in 2015 and the agency’s oversight plans for the remainder of 2016. On hand will be agency employees responsible for inspections of the plant, including the resident inspectors who are based full-time at the plant.

The NRC’s Reactor Oversight Process is the foundational program that enables the agency to successfully complete its mission of assessing plant safety. Under that program, the NRC gauges plant performance through the use of color-coded inspection findings and performance indicators, which are statistical measurements of plant performance that can trigger additional oversight if exceeded.

Based on its 2015 reviews, the NRC determined that the Limerick nuclear plant, which is owned by Exelon and is the site of two boiling-water reactors, operated safely during 2015. As of the end of last year, Limerick Units 1 and 2 had no inspection findings that were “greater than green” or no performance indicators that were other than “green” (very low safety significance) and will therefore receive the NRC’s normal battery of reviews, barring any changes.

The NRC’s normal level of oversight at each U.S. nuclear power plant involves thousands of hours of inspection. In 2015, the agency devoted approximately 5,300 hours of review at Limerick.

“Our Annual Assessments allow us to step back at regular intervals and size up plant performance. However, we view oversight of each facility as an ongoing responsibility,” Acting NRC Region I Administrator David Lew said. “In the case of Limerick, the plant’s current performance qualifies for our normal level of oversight.”

The NRC issues reports on performance at each plant twice a year: during the mid-cycle, or mid-point, of the year, and at the conclusion of the year. Inspection findings and performance indicators are also updated on a quarterly basis on the agency’s website. Following the release of the Annual Assessment letters each March, the NRC meets with the public in the vicinity of each plant to discuss the results. Normal inspections are carried out by the two resident inspectors assigned to Limerick. Reviews are also performed at the sites by specialist inspectors on a periodic basis.

Among the areas to be inspected this year at Limerick are radiological safety, fire protection and the plant’s problem identification and resolution program. In addition, the NRC will inspect the plant’s dry cask storage facility for spent nuclear fuel.

The Annual Assessment letter for Limerick, as well as the notice for the May 23 open house, are available on the NRC website. Current performance information is also available for Limerick Unit 1 and Unit 2.

Download PDF

NRC Issues Confirmatory Order to Entergy Regarding Palisades Nuclear Plant

No: III-16-010
May 16, 2016
CONTACT: Viktoria Mitlyng 630-829-9662
                     Prema Chandrathil 630-829-9663

NRC Issues Confirmatory Order to Entergy Regarding Palisades Nuclear Plant

The Nuclear Regulatory Commission has issued a Confirmatory Order to Entergy Nuclear Operations Inc. under which the company will perform a series of actions to address failures in handling a leak from the safety injection refueling water tank (SIRWT) into the control room at the Palisades Nuclear Plant.

The plant is located in Covert, Mich., five miles south of South Haven.

The order stems from a settlement reached under the NRC’s alternative dispute resolution (ADR) process requested by plant-owner Entergy to address the violations identified in the NRC’s investigation. The violations are connected to the discovery of leakage from the plant’s control room ceiling on May 18, 2011.

Download PDF

NRC Schedules Meeting with TVA to Discuss Watts Bar Work Environment Improvement Plan

Nuclear Regulatory Commission - Press Release
No: II-16-030 May 16, 2016
CONTACT: Roger Hannah 404-997-4417
Joey Ledford 404-997-4416

NRC Schedules Meeting with TVA to Discuss Watts Bar Work Environment Improvement Plan

The Nuclear Regulatory Commission staff has scheduled a meeting with Tennessee Valley Authority officials for Tuesday, May 24, to discuss TVA’s response to an NRC “chilling effect” letter issued in March to the Watts Bar nuclear plant.

The plant is located near Spring City, Tenn., about 60 miles southwest of Knoxville.

The NRC had found that some operations employees may not have felt free to raise safety concerns, and some licensed operators may have been unduly influenced and directed by sources external to the control room. That hesitancy to raise concerns is what the NRC calls a chilling effect.

The NRC met with Watts Bar officials on March 22 and issued the letter on March 23. That letter requested a response outlining what TVA is doing to address the concerns.

During the May 24 meeting, the Watts Bar staff plans to brief the NRC on the current status and progress of actions to improve the chilled work environment in the operations department at the plant.

The meeting is scheduled to be held in the NRC’s Region II office at 245 Peachtree Center Avenue NE in Atlanta at 10 a.m.

The public may observe the meeting and NRC officials will be available after the business portion to answer any questions. For people unable to attend, a toll-free teleconference line will be available.

Anyone wishing to listen to the meeting should contact Alan Blamey by May 23 at 404-997- 4415 or alan.blamey@nrc.gov.

Download PDF

PA nuke scrammed

This is misleading because it claims all safety systems responded the way they were supposed to. However the high pressure injection system was inoperable (although not called upon). This is how accident get started.

Power Reactor    Event Number: 51925
Facility: SUSQUEHANNA
Region: 1 State: PA
Unit: [ ] [2] [ ]
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: CARL YOUNG
HQ OPS Officer: HOWIE CROUCH    Notification Date: 05/13/2016
Notification Time: 05:00 [ET]
Event Date: 05/13/2016
Event Time: 01:10 [EDT]
Last Update Date: 05/13/2016
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
50.72(b)(3)(v)(C) - POT UNCNTRL RAD REL
50.72(b)(2)(iv)(A) - ECCS INJECTION
Person (Organization):
ART BURRITT (R1DO)
SCOTT MORRIS (NRR)
Unit    SCRAM Code    RX CRIT    Initial PWR    Initial RX Mode    Current PWR    Current RX Mode
2    M/R    Y    100    Power Operation    0    Hot Shutdown
Event Text
MANUAL REACTOR SCRAM DUE AFTER LOSS OF AN ESSENTIAL MOTOR CONTROL CENTER

"At approximately 0110 hours [EDT] on May 13, 2016, Susquehanna Steam Electric Station Unit Two reactor was manually scrammed by plant operators due to a sustained loss of AC power to essential plant loads. Power to MCC 2B246 was lost at 2355 on May 12, 2016, resulting in a loss of Drywell cooling. Drywell pressure increased to 1.3 psig when operators placed the mode switch to the shutdown position to manually SCRAM the reactor. All rods inserted as expected. Reactor water level lowered to -27 inches and was immediately restored by normal feedwater level control. Level 3 (+13 inch) PCIS isolations occurred, along with an initiation of the RCIC system (-30 inches). Once adequate level was verified, RCIC was overridden. Pressure was controlled with turbine bypass valves, and subsequently main steam line drains. All safety systems functioned as expected.
"The power loss also tripped Reactor Building HVAC, causing a loss of secondary containment differential pressure resulting in a loss of safety function.
"Due to the loss of drywell cooling, high drywell pressure actuations and a second reactor SCRAM signal, this signal was automatic, occurred at 0314 hours. HPCI [which automatically initiated on high drywell pressure] was subsequently overridden and declared inoperable, resulting in a loss of safety function. [HPCI did not inject into the vessel].
"The reactor is currently stable in Mode 3. Initial reports from the field indicate a phase to phase fault on the MCC 2B246 bus bars."
The licensee has notified the NRC Resident Inspector and will be issuing a press release.

NRC Proposes $3,500 Civil Penalty for Connecticut FirmOver Nuclear Gauge Security Control Deficiencies

Press Release I-16-001: NRC Proposes $3,500 Civil Penalty for Connecticut FirmOver Nuclear Gauge Security Control Deficiencies

Download PDF

NRC Proposes $42,000 Civil Penalty for Connecticut Company for Willful Import, Possession and Distribution Violations

Press Release 16-028: NRC Proposes $42,000 Civil Penalty for Connecticut Company for Willful Import, Possession and Distribution Violations

Download PDF

NRC Proposes $7,000 Civil Penalty for Violation at West Virginia Manufacturing Facility

Nuclear Regulatory Commission - Press Release
No. I-16-014 May 13, 2016

NRC Proposes $7,000 Civil Penalty for Violation at West Virginia Manufacturing Facility

The Nuclear Regulatory Commission staff is proposing a $7,000 fine for an Atlanta-based company for a violation of agency requirements. The violation involves maintenance inappropriately done on a fixed nuclear gauge at the firm’s manufacturing facility in Fairmont, W.V.

Based on the results of an NRC inspection and investigation carried out at Novelis Corp.’s Fairmont plant, the agency is also issuing a Severity Level III violation to the company.

Novelis performs aluminum sheet and light-gauge fin/foil cold rolling activities at the facility. The company held an NRC license for the possession and use of fixed nuclear gauges at this location. The gauges are used to measure the thickness of the sheet metal products.

The NRC inspection and investigation completed on Jan. 21, 2016, determined that on Sept. 12 and 13, 2014, there was a violation involving the deliberate actions of plant employees. Specifically, an engineering reliability and automation engineer directed an electrical technician to repair nuclear gauge components related to the radiological safety of the device even though Novelis’ NRC license prohibits such activities.

“Our reviews found that the plant employees involved understood the work they were undertaking was not permitted, but they proceeded with the repairs nonetheless in order to minimize the economic impact on the facility from the inoperable gauge,” Acting NRC Region I Administrator
David Lew said. “These activities could have resulted in unnecessary radiological exposure and possibly physical harm. This enforcement action serves as an important reminder of the need for gauge owners and users to adhere to license conditions meant to ensure the proper handling of nuclear materials.”

In a March 8, 2016, letter, Novelis acknowledged the violation occurred, but it disagreed that the employees acted deliberately. After reviewing the information, the NRC staff concluded that the enforcement action was still appropriate. Based on the apparent economic incentive for the violation, the NRC used discretion to double the fine from base amount of $3,500.

Novelis has notified the NRC of prompt and comprehensive corrective and preventive actions in response to the issue, including the termination of its NRC license, which occurred on Jan. 12, 2016.
The NRC is also issuing a Severity Level III violation to the engineering reliability and automation engineer who authorized the technician to work on the gauge.

The company is required to respond to the violation and proposed civil penalty within 30 days.

Download PDF

NRC and Army Corps of Engineers Issue Final Environmental Impact Statement for Bell Bend New Reactor

Press Release 16-019: NRC and Army Corps of Engineers Issue Final Environmental Impact Statement for Bell Bend New Reactor

Download PDF

YOU’RE INVITED: March for a Clean Energy Revolution … with the Nuclear-Free, Carbon-Free Contingent!

Nuclear-Free, Carbon-Free Contingent to People’s Climate March
Second National Grassroots Conference Call
Monday, May 23, 2016 -- 7pm Eastern

May 11, 2016

Dear Friends,

Please contact Tim Judson at TimJ@nirs.org to join this call.

The March for a Clean Energy Revolution in Philadelphia on July 24, 2016 – right before the Democratic National Convention starts.

This march is our greatest chance to put a nuclear-free, carbon-free energy policy on the agenda in this year’s elections. Thousands of anti-fracking, climate justice, and clean energy activists are mobilizing for the march -- and we need to be there too!

NIRS is hosting the nuclear-free, carbon-free contingent at the march. We absolutely must put the dangers of nuclear power front and center in the national debate.

We will host the second national grassroots conference call on organizing the nuclear-free, carbon-free contingent on Monday, May 23 at 7pm Eastern.

Two years ago, thousands of us mobilized for the People’s Climate March in New York City, and made the nuclear-free, carbon-free message at the core of the largest climate mobilization in U.S. history. Ultimately, we got the EPA to take nuclear power out of the Clean Power Plan – and kept nuclear power out of the 2015 Global Climate Treaty in Paris!

We will bring you up-to-date with our latest information on the march itself, plus our activities. Buses and carpools are being organized from cities throughout the east coast and Midwest, which you can get plugged into.

Bring your updates, ideas, questions, thoughts and concerns to this call!

Thanks, and we’ll talk on Monday the 23rd,

Michael Mariotte and Tim Judson
NIRS

P.S. Our Facebook group page for the nuclear-free, carbon-free contingent is being updated for the Clean Energy Revolution march: https://www.facebook.com/groups/nukefreeclimatefreemarch/  If you’re on Facebook, please join it and post your information.

Susquehanna Steam Electric Station, Units 1 and 2 - Relief Requests for the Third 10-Year Inservice Inspection Interval (CAC Nos. MF6302 through MF6307)

Susquehanna Steam Electric Station, Units 1 and 2 - Relief Requests for the Third 10-Year Inservice Inspection Interval (CAC Nos. MF6302 through MF6307)

Download ML16069A199

Peach Bottom Atomic Power Station, Units 2 and 3 – Issuance of Amendments re: Inservice Leak and Hydrostatic Testing Operation

Peach Bottom Atomic Power Station, Units 2 and 3 – Issuance of Amendments re: Inservice Leak and Hydrostatic Testing Operation

Download ML16084A968

NRC, Pentagon Sign MOU Outlining Roles in Unlicensed Radioactive Material Cleanup at Military Bases

Press Release No. 16-025: NRC, Pentagon Sign MOU Outlining Roles in Unlicensed Radioactive Material Cleanup at Military Bases

Download PDF

PA DEP News Release : DEP Reaches Natural Resource Damage Settlement with Talen Generation, LLC for 2005 Martins Creek Ash Spill

DEP Reaches Natural Resource Damage Settlement with Talen Generation, LLC for 2005 Martins Creek Ash Spill

The Pennsylvania Department of Environmental Protection (DEP) and the Pennsylvania Fish and Boat Commission (PFBC) have entered into an agreement with Talen Generation, LLC, for the company to pay a total of $952,150.00 for natural resource damages associated with the August 2005 ash spill at the Martins Creek Steam Electric Station in Lower Mount Bethel Township, Northampton County. The fine money will be directed to mussel restoration and dam removal projects in tributaries to the Delaware River.

The spill occurred after a wooden stop log in the Ash Basin No. 4 discharge structure failed, causing an estimated 100 million gallons of ash material to spread across local fields and into the Oughoughton Creek and the Delaware River. DEP, working with PFBC, the Delaware River Basin Commission (DRBC) and the New Jersey Department of Environmental Protection (NJDEP), determined that the mussel population in the Delaware River was impacted as a result of both the spill and the cleanup. Mussel restoration and dam removal projects will assist in the restoration and vitality of the mussel populations and improve aquatic habitat and water quality.

Read Article

Monday, May 2, 2016

THREE MILE ISLAND NUCLEAR STATION, UNIT 1: NRC SECURITY INSPECTION REPORT 05000289/2016403

THREE MILE ISLAND NUCLEAR STATION, UNIT 1:  NRC SECURITY INSPECTION REPORT 05000289/2016403

Download ML16123A092

Susquehanna Steam Electric Station, Unit 2 – Acceptance of Requested Licensing Action

Susquehanna Steam Electric Station, Unit 2 – Acceptance of Requested Licensing Action Re: License Amendment Request for Temporary Change of Unit 2 Technical Specifications 3.7.1 and 3.8.7 to Allow Replacement of Unit 1 480 Volt Engineered Safeguard System Load Center Transformers

Download ML16109A336

Three Mile Island, Unit 1 - Integrated Inspection Report 05000289/2016001

Three Mile Island, Unit 1 - Integrated Inspection Report 05000289/2016001

Download ML16119A047