An Update To The On-going Revision to NUREG-0654/FEMA-REP-1
Development
of draft Revision 2 of NUREG-0654/FEMA-REP-1 continued during the 1st
quar- ter of calendar year 2014 in preparation for the formal public
comment period, which is scheduled to start in Octo- ber 2014. A
preliminary draft of Section I was developed and changes to the
evaluation criteria in Section II were com- pleted after considering
feed- back from the stakeholder engagement sessions held in October
2013. Prior to holding another stakeholder engage- ment session, the
document was provided to NRC and FE- MA staff for comment in April 2014.
During May 2014, the lead NRC-FEMA writing team made further changes to
Sec- tions I and II based on staff input.
Download PDF
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment