Monday, October 14, 2013

Hole in Beaver Valley Containment



Event Number: 49413
Facility: BEAVER VALLEY
Region: 1 State: PA
Unit: [1] [ ] [ ]
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: PATRICK HARTIG
HQ OPS Officer: PETE SNYDER
Notification Date: 10/05/2013
Notification Time: 01:19 [ET]
Event Date: 10/04/2013
Event Time: 23:24 [EDT]
Last Update Date: 10/05/2013
Emergency Class: NON EMERGENCY
10 CFR Section: 
50.72(b)(3)(ii)(A) - DEGRADED CONDITION
Person (Organization): 

JUDY JOUSTRA (R1DO)



Unit

SCRAM Code

RX CRIT

Initial PWR

Initial RX Mode

Current PWR

Current RX Mode

1

N

N

0

Refueling

0

Refueling


Event Text


UNEXPECTED CONTAINMENT LINER PENETRATION FOUND

"On October 4, 2013, during the Beaver Valley Unit 1 refueling outage, a planned visual examination of the interior containment liner and coatings was being performed. The containment design consists of an interior steel liner that is surrounded by reinforced concrete. An area approximately 0.4 inches by 0.28 inches was discovered that penetrated through the containment steel liner plate. 




"With the plant currently shut down and in Mode 6 the containment as specified in Technical Specification 3.6.1 is not required to be operable. The cause of this discrepancy is currently being evaluated.
  
"This is reportable pursuant to 10 CFR 50.72(b)(3)(ii)(A). 

"The Site Resident Inspector has been notified."