On May 8, 2013, the U.S. Nuclear Regulatory Commission (NRC) held a
site visit held at the Bell Bend Nuclear Power Plant site, near Berwick,
Pennsylvania. Enclosure 1 provides a summary of the site visit. The
purpose of the site visit was to work with the U.S. Fish and Wildlife
Service to finalize the Indiana Bat Summer Survey Plan in order for the
applicant, PPL Bell Bend, LLC, to begin surveys in May or June 2013. The
data collected in the survey will be used by the NRC and the U.S. Army
Corps of Engineers to support the biological assessment for the project
as required by the Endangered Species Act. Enclosure 2 contains the
agenda for the site visit; Enclosure 3 contains an attendance sheet from
the site visit; Enclosure 4 contains a revised survey locations map
that reflected the changes discussed at the beginning of the site visit;
and Enclosure 5 contains a revised survey locations map that reflected
the changes that were discussed during the site visit.