From the Professional Reactor Operator Society:
The NRC issued an Inspection Report dated May 2008 and noted (from previous reports also) that a small amount of contaminated water was leaking from the Unit 2 spent fuel pool and subsequent additional subsrface groundwater contamination emanating from the Unit 1 spent fuel pool system. At that time Entergy committed to remove and transfer all spent fuel from Unit 1 Spent Fuel Pool to Indian Point's Independent Spent Fuel Storage Installation, and drain the spent fule pool by Dec 31, 2008.
Entergy is seeking a license amendment request to authorize the transfer of spent fuel from the spent fuel pool at Indian Point Nuclear Generating Unit NO.3 (IP3) to the spent fuel pool at Indian Point Nuclear Generating Unit No.2 (IP2) using a newly designed transfer canister. From there, Entergy intends to transfer the spent fuel to the independent spent fuel storage installation which already exists at the site.
No comments:
Post a Comment